Teams selected a project from topics proposed by team members in Assignment 2. In Assignment 4, teams developed a project scope and a Work Breakdown Structure (WBS) for the topic/product selected. In this assignment, teams will present findings/results from this notional project achieved through study and research.
Teams selected a project from topics proposed by team members in Assignment 2. In Assignment 4, teams developed a project scope and a Work Breakdown Structure (WBS) for the topic/product selected. In this assignment, teams will present findings/results from this notional project achieved through study and research.
Use the following guidance to complete this assignment:
Introduce the project, providing an overview of the project, the goals or objectives, scope, etc. that was described in Assignment 4.
Describe the project scope using the WBS as the basis for the discussion. Plan to describe the work at no more than level 3 of the WBS.
Describe problems/potential problems with the following aspects of the project, using examples. Describe why they are or could be problems:
Communications
Language barriers
Cultural dimensions (differences, leadership, logistics, anything else…)
Geographic dispersion of the team (time zones)
Considering your target audience, what recommendations would you make to modify the make-up of team membership to make you r project more successful? Justify your recommendations.
Describe what new knowledge you have learned from this project when considering managing an international project.
INSTRUCTIONS
For Assignment 7, provide the following:
The presentation will be completed and submitted in MS PowerPoint. Only one team member is required to submit the final product.
At a minimum the following slides are required:
Cover page with assignment details, team name, and team member names
Project Introduction
Project Scope
WBS
Cultural Factors
Recommendations
New Knowledge
Do you need high quality Custom Essay Writing Services?